Anh Tuấn
1 post
|
Topic: The Club House /
https://meeyland.com/mua-ban-nha-dat/da-nang
Investor “control up” list, every fake signatures to reconcile people to the project?
“They turned” into a shop Tennis coffe,
As reflected many people’s life living in high-rise complexes Xi Grand Court
(No. 256-258 Ly Thuong Kiet Street, Ward 12, quan.10, Member Pho.HCM) upset at work
the expenditure as a Limited Liability Company Investment design Thuan Phu Son (Phu Son
Thuan) not transparent public legal information related to the area
joint ownership. In addition, fire safety information is in its people
This concerns especially after the fire occurred on the night of 1/12.,
According H.M.T residents (all 21-storey apartment located commune bloong B), Mr. DC Phu Son
Conveniently service handover from time but next month 1/2019 8/2018 January communities Xi
Grand Court new authorities closely acceptance facilities planning work as well as
fire safety. Worth mentioning, the works to be accepted only with the 7th floor fire protection
or more, not including catering trade from the ground floor to the 6th floor,
“Firefighting is a problem affecting the lives of all residents but far
Investors still are not taken to bring our Shop PCCC test records
part podiums commercial & residential community basement. We are pressing and night
1/12 in apartment fire occurred, threatening residents "- Mr. T. said.,
Holding general area is emerging issues that residents Xi Grand Court fight
Company Thuan Phu Son throughout time. Residents N.T.K.N (apartment owners in
19-storey block B), said at the 7th floor area of the apartment is currently being invested
“Spun” hiring services are not properly functioning.,
Specifically, the Company Thuan Phu Son gave the parties equal parts operating lease
billiards, cafe, even opened a business place. Meanwhile, the area
an area for general utility in the 7th floor was not this investor
open to residents know. Rent this ground many residents do not
use on the job know what? Revenues – money back ?,
Residents H.M.T for or when selling apartments in Xi Grand Court, Phu Son
Conveniently ad Property Project 3 house community association living community located on the 1st floor house building, including
sports grounds (basketball and tennis) than large square 1.800met wide. But today’s date,
only 1 room apartment and domestic activities small community located at the 7th floor, and the position
Tennis has become the investors leased the cafe open.,
Forged signatures of residents ?,
According to our research, the Ministry of Construction HCMC carry Decision No. 109 / QD-SXD-Lab Day
30/7/2009 approved the investment project to build a combination Xi grand Court building. After
that spending decisions are adjusted 3 times.,
First time in 2010, then five years ago by Decision No. 38 and
once at the top end in 2018 with Decision No. 27,
According to Decision No. 38, the scale of people’s daily volume in projects Xi Grand Court Games 1670
people. Total 748 homes, including 548 apartments, 200 serviced apartments for rent.
The total planned floor 57.656m2 podium, with 624m2 of living area plus
copper, 664m2 house reserved for child care.,
To Decision No. 27, the population size in the project as soon as this did not break up 2222
people, a total of 748 apartments have been allowed through the sale of operations moved permanently.
Although total floor area square 56.712met podiums reduced, however
all areas of public life and in the apartment kept low tgia still not
explosive.,
In this decision, according to records the basic design is operated Administration
is set for evaluation and Construction Department of Ho Chi Minh City found the adjustment locations,
utility room between the living community associations, child care center and commercial area
the ground floor and the 7th floor of the building, another for solutions
basic design approved in Decision No. 38,
“Investors have been conducted right next to home buyers is included (sold 224/748
Apartments in the project), with the consent was 224/224 apartments already sold, the ratio
100%. But investors need to organize meetings residents, invited Ward People’s Committee attended
to inform the official status of implementation of the consultation for the
position adjustment feature common room, daycare and parks
trade in services … ", text stating DoC.,
Decision No. 27 was largely populated by Xi Grand Court objected when deciding
promulgated Son Thuan Company has signed documents handing injured purchase apartments
consumers, but there is a fraudulent act of customer consultation.,
Specifically, according to residents N.T.K.N, who signed the contract with the apartment purchase
Son Phu Thuan on July 24/5 / 2016. She certainly can not be consulted
when applying for project approval adjust but investors have already taken the DoC reviews
100% of the customer is signing papers, like this is cheating you, donkey engine
authorities. ,
Other residents he D.Q.G (all 14-storey apartment block A2) said that, in the
People meeting with students, representatives on behalf of the Company on behalf of Phu Son Thuan not provide supply
list of 224 signatures that all residents receive is all that took.
In addition, the general area of the apartment owner is how much, Dad
How Hotel residents are also unaware ?,
Before this urgent, commanding City Construction Department. HCM has been meeting work
resident representative Xi Grand Court in mid-January 8/2019.,
Tran Hung Anh, Deputy Chief Inspector of the Department of Construction said in Decision
27 have stated, the Company Phu Son Thuan opinions of 224 people, this is
those rights, favorable correlation to Decision No. 27. Suggested residents
People providing apartment purchase contract before the period for issuing decisions
DoC based considerations.,
With proposed support of 224 residents that list investors that took the
is Deputy Chief Inspector of Construction Services for or continue to think and specific comments
Can.,
To clarify matters Xi Grand Court residents reflect, PV had contact with
Thuan Phu Son Company from time dated 11.26.2019, although that last more than 10 days, he
Nguyen Van Thinh, Deputy Director of Phu Son Thuan, suggesting businesses remain
is preparing to close for the replay (!?).,
According to Phuong Linh
VietNamNet,
|